Led by Surveying Project Manager Kent Withers, our team has been involved in laying the groundwork of Fairfield’s infrastructure since 2016. Working with original documents dating back to before the Civil War, Kent was able to determine the town’s interest in the roadway as well as vacating portions of the unnecessary roadway while also developing dedication maps for the roads not included in the original plat. All of this is in preparation for the inevitable development that is coming for the town of Fairfield. We’re proud to be a part of this growth.